Grade & Helix Calculator
- Pro · gratuit pendant la bêta
- Dans la prochaine version
Check every ramp and helix against your train (grade, radius and the room between a helix's turns) and plan a helix before you lay it.
A climb between two decks has to suit the train that runs on it. Too steep, and the loco slips or stalls. On a helix, each turn runs under the next, so the turns have to be far enough apart for the train to pass underneath.
The Grade & Helix Calculator checks both, for the ramps and helixes on your plan and for one you haven't laid yet. It's a Pro module: during the open beta it's open to everyone, marked Pro · free in beta. Open it from the Layout tab of the inspector, below Layout Stats.
It checks against your reference train: the one picked in the Validation panel, or the strictest of your own trains when you validate against them. Lengths follow your unit setting.
On your plan
#The panel lists every ramp and helix laid on the plan. A run is the stretch of inclined pieces joined end to end, so the climb from one deck to the next reads as one, however many pieces it takes. The run your selection touches comes first, marked Selected.
For each one you get:
| Figure | What it is |
|---|---|
| Rise | How high it climbs, and between which decks. |
| Track | The length of track it climbs over. |
| Grade | Rise over track, in %. If one piece climbs steeper than the rest, its grade shows too. |
| Radius | Its tightest curve. |
| Per turn | On a helix, how much one full turn climbs. |
| Room | On a helix, the height left under each turn for a train: the climb of one turn, less the board and the track of the turn above. |
Under the figures, a line says whether your train gets up it, or what's wrong in plain words: too steep, a curve too tight, turns too close together, or a top that stops short of the deck it was heading for. Click a run to select it and bring it into view, framed where its turns are closest when they're too close.
Grade labels in the Overlays list at the top right of the canvas (or View → Grade labels) puts a label on each ramp and helix: its grade and, on a helix, its turns and the room under each one. A label edged in red is one your train won't get up.
Plan a helix
#Below the list, the calculator works one out before you lay anything. Give it:
- Climb: the height to climb. Between decks… fills in the height between two of your decks.
- Radius: the radius of the track's centre line.
- Max grade: the steepest climb you allow. It starts at what your train manages.
- Board: the thickness of the board or roadbed under each turn. 12 mm plywood is usual. The track's own height comes from your track range.
It tells you:
- how many turns the climb takes at that grade,
- how much each turn climbs, and the room that leaves for your train,
- the track it takes, and the footprint: how wide a circle of baseboard it needs,
- whether your train fits, and if it doesn't, the radius that would make room for it, or a steeper grade if your train can take one.
The calculator climbs at the grade you allow, because that's what leaves the most room between the turns. More turns at a gentler grade bring the turns closer together. So when your train doesn't fit, adding turns won't help: the radius has to grow.
Until you change them, the inputs follow your layout: the climb between its two lowest decks, your train's grade, and the smallest radius that leaves your train room. What you type is remembered on this device. Follow the layout again goes back to those defaults.
From your track range
#If the track ranges your layout uses sell ready-made ramp or helix pieces, the calculator checks each against the same grade, train and board, and says how many it takes to climb your height. The ones that fit have a Lay it button, which picks the piece in the catalogue ready to place. The others say why they don't fit.
Most ranges don't sell a climb ready-made. Build it from the range's curves and straights instead, then select them and set their Incline under Properties, as Ramps and helixes explains.
Why grade and room matter
#A loco pulls by the grip of its wheels on the rails. On a climb, part of its effort goes into lifting the train, so past the grade it's made for it slips, stalls, or can only pull a short train. The reference trains manage 2.5% (OO and HO) or 3% (N).
Each turn of a helix is built on a board above the turn below. The train needs its full height under that board, plus the track it runs on. With 12 mm of board, 4 mm of track and a 58 mm OO train, each turn has to climb at least 74 mm.