Overlapping track

  • Gratuit
  • Dans la prochaine version

Track laid across, on top of or too close alongside other track is flagged, whatever train you're building for.

Two pieces of track can't lie on each other at one level. Where one crosses another you need a crossing piece, a diamond or a slip. Where one sits on another, or alongside it closer than the track is wide, one of them has to move. The planner normally refuses to lay track like that. Tick I know what I'm doing in the status bar and it lays it anyway, and the Validation list flags the result as Overlapping track.

The check runs on every layout. It doesn't need a reference train, or Pro.

What's flagged

#
  • Track crossing track with no crossing piece. The marker sits where the two cross.
  • A piece on top of another, such as one dropped where a piece already lies. The marker sits in the middle of the stretch they share.
  • Track alongside track closer than the track is wide, centre to centre. The issue says how far apart the two are.
  • Flex drawn back across its own path, whether the run crosses another of its pieces or one piece loops over itself.
  • A piece that curls back across the piece it's joined to, away from the joint.

Each is a red error. Both pieces are tinted red on the canvas, as with any failing check, and the issue names them.

What isn't

#

Track that shares space by design isn't flagged:

  • Pieces joined end to end. So are ends that meet without a join: two track ranges that can't join butted together, or a loop left a millimetre or two short of closing.
  • Junctions. The roads leaving a turnout's points start out on top of each other, and on sectional track they're still closer than a track's width where the turnout ends, so the pieces you lay on its two exits overlap for a while too. The same goes for wyes, three-ways, slips and crossovers, and for the tracks either side of a diamond. The check follows each road from the junction until the two are a track's width apart, and only compares them from there. Past that point, a track laid across one of them is flagged like any other.
  • Track on another level. Track over track is a bridge. Whether a train fits underneath is for the clearance check to say.
  • Turntables, which track is laid all round, and structures such as buildings and platforms.

The planner takes track to be 24 mm wide here, the roadbed of OO and HO sectional track. It's the same width the Place tool goes by when it refuses an overlap. Two O-gauge tracks can still sit on each other a little further apart than that without being flagged.

With a reference train

#

When you validate against a train, the clearance check also flags tracks too close for two trains to pass. Two tracks on top of each other leave no room for a train either, at the same spot, so a pair like that is listed once, as overlapping track, not as a clearance conflict as well. Tracks that clear each other but not your train are still clearance conflicts.